Three phase EV charger, Portsea
A three phase Mercedes wallbox in a Portsea carport, mounted back to back with the switchboard for the shortest cable run and full charging speed.
View projectConnection interrupted
Trying to reconnect
Something went wrong
Trying to reconnect
Home EV charging done properly. Load-checked, dedicated circuit, no shortcuts.
A good install starts at your switchboard, not the charger. We check capacity, run a dedicated protected circuit, and commission the unit cleanly.
All major brands installed, with smart charging set up to suit your tariff.
Recent work
Good to know
Every install starts with a switchboard and load check. Most single-phase homes can take a 7kW charger on a dedicated circuit; the final scope depends on cable runs and board capacity, which is why we quote after a quick assessment rather than guessing.
A few details is all it takes. We confirm the scope and quote before any work begins.